Sydney Oswald, PPJ, Spring Week 1

Tasks:

  • Set up script recording with all actors: 5h
  • Work on models and UV new room: 4h

Total Hours: 9h

Positives: I slept a lot over break and that’s good and cool. I did not take pictures of that. I emailed a bunch of people and scheduled a bunch of things so my calendar is now a little scary.

Negatives: I’m still tired and my cat died.

Here is a picture of the best boy.

image0

Looking Ahead: finish off models still locked away in my D drive, GET THEM IN SCENE pls, record Mavis’ dialogue, scream

Chris Lucas, PPJ, Winter Week 1

Tasks:

  • Complete Biowall Models
  • B – R – E – A – K

Total Hours: 2

Positives: Break was great. I went to San Juan with my family, hiked through a rainforest, ocean trails, and other things. Grabbed pictures of textures for scanning and VR photo and video of the trip too. It was a lot of fun, and San Juan is also full of really friendly cats. I also worked on the project some, but not much. Luckily I completed most of the biowall models before I left when I made the multiple flowers and assets before, so all I need to do now is arrange them.

Negatives: Had less time to work on this than I thought I would before leaving for San Juan because of a surprise funeral. Still got stuff done though, and it was break, so no big wrench in the process. 

Looking Ahead: So, so much production. Probably starting with the rest of the puzzle areas.

  • Environment for painting area
  • Placing models correctly for biowall